Suite Alivar double bed
Similar products (12)
Parameters and description
Suite Alivar double bed Alivar's Suite design bed has a regal allure, with essential lines and a princely aura. The sommier structure is framed by the headboard in steam-curved solid fir wood covered with goose down filling. The bed frame and headboard are upholstered in leather or fabric and the feet are produced in painted aluminium according to the Alivar colour chart. A modern, imposing and welcoming bed that invites you to rest. SUITE ALIVAR DOUBLE BED STRUCTURE: The feet are made of painted aluminium: Matt white Cream Beaver Pearl rust Matt dark brown Amaranth Aluminium chrome Embossed aluminium Golden Bronze Pearl black Empire Gold Matt black The structure is upholstered in fabric or leather in the following finishes: Fabric cat. A Fabric cat. B Fabric cat. C Fabric cat. D Leather cat. E Leather cat. F Leather cat. G Luxe leather View the sample book of materials and enter the colour code in „Product customisation“.Spruce plywood bed base included, with 25 mm curved slats with rigidity adjusters in the lumbar region. SUITE ALIVAR DOBLE BED DIMENSIONS: The Suite bed is available in the following versions and dimensions: Suite Standard – W. 203 cm x D. 243 cm x H. 99 cm (for mattress 160×200, not included; bed base included) Suite King Size – W. 233 cm x D. 249 cm x H. 99 cm (for mattress 193×203, not included; two single bed bases included) Europe Suite – W. 223 cm x D. 243 cm x H. 99 cm (for 180×200 mattress, not included; bed base included) Standard Suite storage bed – W. 203 cm x D. 243 cm x H. 99 cm (for mattress 160×200, not included; bed base included) King Size Suite storage bed – W. 233 cm x D. 249 cm x H. 99 cm (for mattress 193×203, not included; two single bed bases included) Europe Suite storage bed – W. 223 cm x D. 243 cm x H. 99 cm (for mattress 180×200, not included; bed base included) FEET FINISHES: DELIVERY TIME: Estimated time for production and product delivery 7/8 working weeks from payment received.Deliveries from manufacturing companies may be delayed during this period.