Taara Martex Office chair with low back
Similar products (1)
Parameters and description
Taara Martex Office chair with low back Taara Martex is an office chair with low backrest, with a contemporary style, it comes with a linear profile and an ergonomic shape designed to convey a high level of comfort. Equipped with a low backrest while the seat is wide and comfortable, perfect for furnishing executive offices, meeting rooms and large conference rooms. TAARA MARTEX OFFICE CHAIR STRUCTURE WITH LOW BACK: Internal bearing insert, in shaped steel. Padding in flexible, non-deformable, fireproof, cold-moulded polyurethane foam, available in the following cover categories: Faux leather – Cat. E Main line flax fabric – Cat. L Sphere fabric – Cat. L Focus Melange fabric – Cat. I Leather – Cat. G Capture fabric – Cat. I Base with 5 and 4 spokes in polished aluminum or black aluminium.View the material samples.The following wheels are available: For hard stone, wood and tile floors For carpet or rug Drilled wheel Chrome wheel Chrome wheel 5 Relax Mechanism – Swivel – Gas Polished aluminum Relax mechanism, oscillation up to 8° Right lever for height adjustment, gas operated Mechanism 6 Relax – Swivel – Gas Black painted aluminum Relax mechanism, oscillation up to 8° Right lever for height adjustment, gas operated For a personalized composition and for more information, contact customer service. TAARA MARTEX OFFICE CHAIR WITH LOW BACK SIZES: The available sizes are as follows: TAARA SEAT WITH LOW BACK, 5 star polished aluminum base, 1 wheel, for hard floors – L. 65 cm x D. 68 cm x H. 75 cm TAARA SEAT WITH LOW BACK, 5 star black nylon base, 1 wheel, for hard floors – L. 65 cm x D. 68 cm x H. 75 cm TAARA SEAT WITH LOW BACK, 4 star polished aluminum base – L. 66 cm x D. 58 cm x H. 85 cm TAARA SEAT WITH LOW BACK, 4 star black aluminum base MECHANISM 5 Relax Mechanism – Swivel – Gas Mechanism 6 Relax – Swivel – Gas MARTEX DELIVERY TIMES: Estimated time for production and delivery of the product 6 working weeks from payment received.In this period, deliveries by the manufacturing companies may be delayed.